Equipment is priced globally, installation is priced locally, and that is most of the spread between quotes. Three specific jobs modelled from Eurostat labour costs, plus the site-work lines that are missing from your first quote.

Veted Editorial·26 August 2026· 8 min read·Renovation & Project Management
White air conditioner unit displaying 22 degrees
Photo by Zulfugar Karimov on Unsplash

Air conditioning is quoted so inconsistently across Europe that two prices for the same flat can differ by a factor of three without either being dishonest. The equipment is a global product priced within a fairly narrow band; the installation is local labour priced by a market that pays a Portuguese fitter roughly a third of what a Dutch one costs. Most of the spread you will see is that, plus a handful of site conditions nobody mentions until the day.

So rather than quote a single European price, this piece prices three specific jobs, in three specific sizes, and shows the working. Where a number comes from published data it is labelled as such. Where it is our estimate, it is labelled as that too.

The three jobs

HomeSystem that normally fitsRough capacityInstallation time
40 m2 apartment, one roomSingle split, about 3.5 kW3.5 kW7 labour hours
70 m2 apartment, two roomsDual-zone multi-split, about 5.2 kW5.2 kW15 labour hours
150 m2 house, four roomsFour-zone multi-split or ducted, about 12 kW12 kW34 labour hours
Capacity assumes a moderately insulated home with shading in place. An unshaded top-floor flat with large west-facing glazing needs a size up, which is a good reason to fix the shading first.

A 40 square metre apartment is the simple case: one outdoor unit, one indoor head, a short pipe run, a day's work for two people including making good. A 70 square metre flat usually means cooling a living space and a bedroom, which is a dual-zone multi-split sharing one outdoor unit, longer pipe runs and more making good. A 150 square metre house is a different job again: four zones or a ducted system, a proper electrical circuit, and enough labour that the labour becomes the larger half of the bill in northern Europe.

What that costs, country by country

The chart below combines a published labour rate with our equipment and time assumptions. The labour figure is Eurostat's hourly labour cost for construction, which is what an employer pays per hour worked, marked up by 1.8 to get to a charge-out rate: the same convention the cost tracker on this site uses, so the two agree.

Modelled installed cost by home size
40 m², single split70 m², dual zone150 m², four zone
Portugal
€1,100
€2,500
€6,150
Greece
€1,100
€2,500
€6,150
Poland
€1,100
€2,500
€6,150
Croatia
€1,100
€2,550
€6,200
Spain
€1,200
€2,750
€6,650
Italy
€1,250
€2,900
€6,950
Germany
€1,400
€3,150
€7,600
France
€1,400
€3,200
€7,650
Netherlands
€1,500
€3,400
€8,100
Equipment treated as pan-European; labour from Eurostat hourly construction labour cost, charged out at 1.8x. Excludes VAT, scaffolding and electrical upgrades. · Source: Eurostat lc_lci_lev, plus Veted equipment and time assumptions

Two things stand out. The first is that the cheapest countries to install in are the ones that need it most, which is why penetration in southern Europe has climbed so fast. The second is that the gap widens with job size: on a single split the equipment dominates and the European spread is modest, while on a 150 square metre house the labour content is large enough that the same system costs materially more in the Netherlands or Germany than in Portugal or Croatia.

Cost line40 m²70 m²150 m²
Equipment, indicative900 EUR2,100 EUR5,200 EUR
Labour hours7 h15 h34 h
Labour cost, Spain at 24 EUR/h employer cost302 EUR648 EUR1,469 EUR
Labour cost, Netherlands at 47.7 EUR/h601 EUR1,288 EUR2,919 EUR
Installed total, Spain1,200 EUR2,750 EUR6,650 EUR
Installed total, Netherlands1,500 EUR3,400 EUR8,100 EUR
Before VAT, which ranges from 21 to 25 percent across most of the countries above and is itself sometimes reduced for energy work on existing dwellings.

The lines that are missing from your quote

The modelled figures assume a straightforward job. What turns a straightforward job into an expensive one is nearly always access or electrics, and neither appears on a first quote unless you ask.

  • Pipe run length. Quotes typically include three to five metres of refrigerant line. Running from a balcony head to a roof-mounted condenser can add tens of metres, charged per metre plus extra refrigerant.
  • Height difference between indoor and outdoor units, which is capped by the manufacturer and can force a bigger unit or a different location.
  • Scaffolding or a platform for a facade mount above the ground floor. This is routinely the single largest add-on and it is often quoted separately by a third party.
  • Core drilling through reinforced concrete or stone, and making good on a finished wall.
  • Electrical work: a dedicated circuit and RCD for anything beyond a small single split, and in older southern housing stock an upgrade to the consumer unit or even the supply capacity.
  • Condensate routing. Gravity drainage is cheap, a condensate pump is not much, and a route that crosses common property needs the same permission as the unit.
  • Removal and legal disposal of an old unit, including recovering its refrigerant, which cannot legally be vented.

Grants, VAT and the reversible-unit angle

Almost no European scheme subsidises cooling. Several subsidise heat pumps, and a reversible air conditioner is an air-to-air heat pump, which is why the same box can be ineligible when sold as air conditioning and eligible when sold as heating. Italy has repeatedly allowed a renovation deduction where the unit replaces or supplements a heating system as part of qualifying works. Spain has channelled recovery funding into heat-pump replacements. Several countries apply a reduced VAT rate to energy work on existing homes rather than to the appliance itself.

Two rules follow. Ask the installer to quote the unit as a reversible heat pump where it genuinely is one, because that is the version that can qualify. And check eligibility before the invoice is issued rather than after, because almost every scheme depends on the wording, the date and the payment method on the document itself.

For what the finished system then costs to run, we modelled that separately from European electricity prices and cooling demand, country by country. It is a smaller number than most people expect, and much smaller than the install.

Frequently asked questions

How much does it cost to install air conditioning in a 40 m² apartment?+

One outdoor unit and one indoor head, roughly 3.5 kW, is about a day's work for two people. On our model, which combines Eurostat construction labour costs with indicative equipment prices, that lands near 1,100 EUR installed in Portugal, Greece or Poland, about 1,200 EUR in Spain, and near 1,500 EUR in the Netherlands, before VAT. Equipment is most of the bill at this size, which is why the European spread is narrower for small jobs.

What does air conditioning cost for a 70 m² or 150 m² home?+

A 70 m² flat normally means a dual-zone multi-split sharing one outdoor unit, around 5.2 kW and roughly 15 labour hours, modelling at 2,500 to 2,750 EUR across Portugal, Greece and Spain against 3,400 EUR in the Netherlands. A 150 m² house needs four zones or a ducted system near 12 kW and about 34 hours, modelling at 6,150 to 6,650 EUR in southern Europe against 8,100 EUR in the Netherlands. The gap widens with size because labour becomes the larger half of the bill.

Why do air conditioning quotes vary so much for the same job?+

Two reasons. Labour is local: an hour of construction labour costs roughly three times more in the Netherlands than in Portugal, while the equipment is priced globally. And first quotes routinely omit site work: pipe run beyond the included three to five metres, scaffolding for a facade mount above ground level, core drilling and making good, a dedicated electrical circuit, condensate routing, and removal of an old unit with its refrigerant recovered. Ask for equipment, labour and site works as separate lines.

Are there grants for air conditioning in Europe?+

Almost no scheme subsidises cooling, but several subsidise heat pumps, and a reversible air conditioner is an air-to-air heat pump. The same box can be ineligible sold as air conditioning and eligible sold as heating. Italy has repeatedly allowed a renovation deduction where the unit forms part of qualifying works, and Spain has channelled recovery funding into heat-pump replacement. Check eligibility before the invoice is issued, because most schemes turn on its wording, date and payment method.