Relocating Within Europe: The Home Setup Checklist Nobody Hands You
Freedom of movement makes moving legally simple and practically bewildering. Three documents unlock everything else and roughly half the list is gated behind them, so the order matters more than people expect. The admin sequence, the utility transfers, and the six trades to line up in the first month.
Freedom of movement makes relocating within Europe legally straightforward and practically bewildering. Nobody stops you at the border, and nobody hands you the list either. What follows is that list: the administrative sequence that unlocks everything else, and the trades you will realistically need in the first month. The order matters far more than most people expect, because roughly half of these steps are gated behind one of the others.
The unlock sequence: three documents, in this order
Almost every country runs the same underlying logic under different names. You register your address, you get a tax or personal identification number, and you open a bank account. Each one tends to require the previous one, which is why doing them out of order wastes weeks.
Registering your address is called the Anmeldung in Germany and Austria, the empadronamiento or padron in Spain, inschrijving at the gemeente in the Netherlands, folkbokforing in Sweden, and the CPR registration in Denmark. It is usually a legal obligation with a deadline measured in days or weeks, not a formality, and it is what makes you visible to the rest of the system.
The identification number follows: the NIE in Spain, the NIF in Portugal, the codice fiscale in Italy, the Steuer-ID in Germany, the BSN in the Netherlands, the personnummer in Sweden, the CPR number in Denmark. Without it you generally cannot open a bank account, sign a utility contract, take a mobile plan, or be paid.
The bank account comes third, and once you have it the rest of the list becomes possible. As an EU or EEA resident you have a right of access to a basic payment account, which is worth knowing if a branch is unhelpful, though in practice the friction is usually the address proof rather than a refusal.
The first month, in order
Utilities: transfer rather than reconnect, wherever you can
Taking over an existing supply contract is almost always faster and cheaper than starting a new one, because a new connection can trigger an inspection, a certificate requirement, or a physical visit. Ask the seller or the outgoing tenant for the supply numbers before you take the keys: the meter point identifiers, the current supplier, and the last reading. Photograph every meter on the day you take possession, with the date visible. It is thirty seconds of work and it settles every subsequent dispute about opening readings.
Where a supply has been disconnected or the property has been empty a long time, expect the reconnection to require a certificate of conformity from a locally authorised installer, particularly for gas and electricity. That is a trade booking, not a phone call, and it is the single most common reason a move-in date slips.
The energy certificate you will be asked for
Every EU member state requires an energy performance certificate when a property is sold or let, and you will need a valid one in the file. If you are buying, confirm it exists and check the date, since they expire. If you are letting a property out, several countries now enforce minimum energy ratings for rentals, and the trajectory of EU building rules is towards tightening those thresholds rather than relaxing them. A poor rating is a renovation liability with a deadline attached, not merely a piece of paper.
The trades to line up in the first month
Two of these are safety items you should not defer, and the rest are the ones that determine whether the place feels like yours by the end of the second month.
- A locksmith, on day one. You have no idea how many keys exist for a property you have just taken over, and rekeying is cheap.
- An electrician for a safety check, particularly in older housing stock, and mandatory in some countries before a new supply contract.
- A heating engineer for the boiler or heat pump, since an annual service is legally required in several countries and is the difference between a working system in October and an emergency.
- A plumber for anything that was already dripping at the viewing, because it will not have improved.
- A general contractor or handyman for the accumulated small jobs, booked as one visit rather than six.
- A painter, last, once you have lived in the rooms long enough to know what you actually want.
Booking the safety checks early has a second benefit beyond safety: it gets a competent local tradesperson through the door before you have an emergency, which means the next call is to somebody you have met rather than to whoever answers.
Insurance from the day you hold the keys
Buildings cover should be in force from completion, not from move-in, and in several countries the lender will require it as a condition of the mortgage anyway. Contents cover can follow. Two points catch people relocating: an unoccupied property is often excluded or heavily restricted after thirty or sixty days of vacancy, which matters if you complete before you move, and cover taken out in your previous country will not follow the property. Tell the insurer the truth about occupancy dates and building age; a cheap policy that does not respond is not cheaper.
The mistakes that cost the most time
- Trying to open a bank account before the identification number exists.
- Missing the registration deadline, which carries a fine in several countries and delays everything downstream.
- Cancelling the previous owner’s utility contracts instead of transferring them.
- Not photographing the meters on handover day.
- Booking trades before you have a local bank account they can be paid from.
- Assuming a home-country driving licence, insurance, or professional registration transfers automatically. Some do, several do not, and the deadlines to exchange are real.
Relocating within Europe is genuinely one of the easier international moves available anywhere in the world, and it still rewards doing three specific things first. Get the identification number, register the address, open the account. Everything else on this list becomes routine once those exist, and almost nothing on it is possible before they do.
Frequently asked questions
What do I need to do first when moving to another European country?+
Three documents unlock everything else, in this order: register your address, get the tax or personal identification number, then open a bank account. Each generally requires the previous one, which is why doing them out of order wastes weeks. Address registration is the Anmeldung in Germany and Austria, the empadronamiento in Spain, inschrijving at the gemeente in the Netherlands, and folkbokforing in Sweden, and it is usually a legal obligation with a deadline in days.
Can I get a tax number before I move to Europe?+
Often yes, and you should. Spain's NIE and Portugal's NIF can both be obtained through a consulate or an appointed representative before you arrive. Since the identification number gates the bank account, the utility contracts, and the mobile plan, having it in hand on arrival collapses the first fortnight of administration into a few days. It is the single highest-value thing to do early.
Which tradespeople should I book first after moving in?+
A locksmith on day one, because you have no idea how many keys exist for a property you have just taken over. Then an electrician for a safety check, which some countries require before a new supply contract, and a heating engineer for the boiler or heat pump, since an annual service is legally required in several countries. A plumber for anything already dripping, a general handyman for the accumulated small jobs as one visit, and a painter last.
Should I transfer or cancel the previous occupant's utilities?+
Transfer, almost always. Starting a new supply can trigger an inspection, a certificate requirement, or a physical visit, whereas taking over an existing contract is faster and cheaper. Get the meter point identifiers, the current supplier, and the last reading from the seller or outgoing tenant, and photograph every meter on handover day with the date visible. Where a supply has been disconnected, expect to need a conformity certificate from a locally authorised installer.